06.06.2022

Bekabad Cement Plant performed repair works of rotary kiln No. 2

Comprehensive equipment check and defective works report for minor maintenance became the first stage of works after kiln off-blast. Components of the main drive, kiln fan, push back conveyor, gas torch, electric precipitator were checked. Moreover, 14 m brick replacing faceworks were performed.

[contact-form-7 id="405" title="Обратная связь En"]